Public verification
Verify a report
Every figure CSRise produces carries a reference. Type it in and you get the record behind it, without going through the organisation or through us.
Company report
Clean Water — Ogun
WaterAid Nigeria · prepared for Meridian Bank · period to 6 Sep 2026
What the report claims, and what sits behind it
| Claim in the report | Value | Label | Behind it |
|---|---|---|---|
| Payments recorded | ₦30.0m | Verified | 4 approved milestones, payments reconciled |
| Boreholes yielding to specification | 3 | Verified | Yield tests, potability certificates |
| Households counted at the sources | 412 | Verified | Field officer count |
| People with improved water access | 4,200 | Estimated | Ward population within 1km |
| Reduction in water-borne illness | — | Not measured | No baseline was taken |
What the report also says, because it must
Milestone 3 was queried once before acceptance, because the Ijoko borehole sits 300 metres from the surveyed coordinate. The organisation explained a land dispute and a community meeting, and the milestone was accepted on that basis.
Two of six milestones remain outstanding. ₦15.0m remains allocated and has not been paid to anyone.
If a reference does not resolve
Either it was mistyped, or the document did not come from CSRise. A report that cites a reference which does not exist is worth asking about — politely, because a typo is far more likely than a forgery.
Amendments show, they do not replace
If a report was corrected, this page shows both the original and the amendment with the reason. A reference never silently points at different content than it did last week.